| Items | Details |
|---|---|
| Lead time to start the campaign | 3 days after mockup approval |
| Start-date images shared? | Yes — shared the same day (before 1 pm) the campaign goes live |
| Start-date images count | 4 geo-tagged images + 1 video (geo won’t be visible for videos) |
| Execution report shared? | Yes — shared the next working day (PPT with 5 images + 1 video) |
| Details | Responsibility |
|---|---|
| Creatives must be submitted in PDF, AI, CDR, or any open format | Brand |
| In case of any issue with the creative, the same will be informed to the brand for correction | TMA |
| Jpeg will be shared for approval | TMA |
| Jpeg needs to be approved so that printing can be started | Brand |
| It takes 3 days to make the campaign live post mockup approval | TMA |
| POC (ground team details like name and contact number) for insertion will be provided a day before the insertion, before 7 pm | TMA |
| Details | Responsibility |
|---|---|
| Execution proof will be captured by the ground team with geo location | TMA |
| POC from brand can connect with the ground team to visit the execution site | Brand |
| Details | Responsibility |
|---|---|
| 4 geo tagged images along with 1 videos (geo won’t be visible for videos) will be shared the same day before 1 pm the campaign goes live | TMA |
| Entire execution report (PPT with 5 images and 1 videos) will be shared the next working day | TMA |
PPT will be shared via Gdrive
